Work placement in a proper way for raised floor


Work placement in a proper way for raised floor

In case of new building works on the walls must have been completed with at least 60 days and wet finishing with at least 30 days.

– Firstly it is necessary to demonstrate the possible unevenness of the fabric and after removing the dust from the slab is necessary to dust treatment especially in the case where the span under the floor is used as a channel for air conditioning. It is advisable to check that the treatment is consistent with the dust tail to the columns.

– Then, before the installation of equipment, the installer will have to Read the rest of this entry »